Oversized machinery and industrial equipment cannot always move through standard container shipping.

Project cargo may require planning across:

• Freight mode
• Packing
• Lifting
• Lashing
• Cargo surveys
• Marine insurance
• Heavy haulage
• Final-site unloading

One of the first decisions is often:

Flat Rack, RoRo or Breakbulk?


What Is Flat Rack Shipping?

Flat Rack containers are designed for cargo that cannot fit efficiently inside a standard enclosed container.

They may be suitable for:

• Large machinery
• Industrial equipment
• Oversized cargo
• Over-height equipment
• Heavy structures

Cargo is placed on the Flat Rack and secured according to its weight, dimensions and centre of gravity.

Cargo extending beyond standard container dimensions may also be classified as:

OOG — Out of Gauge.


What Is RoRo?

RoRo means:

Roll-On / Roll-Off.

RoRo vessels use ramps that allow wheeled cargo to move directly onto and off the vessel.

Typical cargo may include:

• Trucks
• Construction machinery
• Mining equipment
• Trailers
• Mobile machinery

Static cargo may also move on specialised wheeled platforms such as MAFI trailers where suitable.


What Is Breakbulk?

Breakbulk cargo moves as individual units rather than inside standard containers.

Loading and discharge may use:

• Ship cranes
• Shore cranes
• Heavy-lift equipment

Breakbulk may be suitable for:

• Very large machinery
• Industrial modules
• Heavy equipment
• Oversized structures
• Energy equipment


Flat Rack vs RoRo vs Breakbulk

There is no single best option.

The transport method depends on:

• Cargo dimensions
• Weight
• Cargo type
• Mobility
• Lifting requirements
• Origin and destination ports
• Schedule
• Freight cost
• Port capabilities
• Final inland transport

The useful comparison is:

Total Project Cost + Schedule + Operational Feasibility.


Why Are Cargo Surveys Important?

For oversized, heavy or high-value cargo, surveys may be used to record and verify loading and securing conditions.

A survey may review:

• Cargo dimensions and weight
• Cargo condition
• Weight distribution
• Lashing points
• Dunnage
• Blocking and bracing
• Securing arrangements
• Final loading condition

Photos and survey reports can provide important documentation for complex project movements.

Specific survey requirements depend on the cargo, carrier and project conditions.


Why Is Lashing Critical?

A vessel is exposed to movement and acceleration at sea.

Incorrectly secured cargo may:

• Slide
• Tilt
• Shift
• Damage lashings
• Contact surrounding cargo or equipment

Securing arrangements should therefore consider:

• Cargo weight
• Centre of gravity
• Lashing point capacity
• Rated securing equipment
• Cargo support area
• Transport method


Packing Is More Than Building a Crate

Project cargo packing should support the complete transport process.

Important considerations may include:

• Forklift access
• Crane lifting
• Accessible lifting points
• Structural crate strength
• Internal securing
• Moisture protection
• Vibration protection
• Inspection access

Packing should ideally be designed together with the logistics plan.


Can Repacking Reduce Freight Cost?

Sometimes oversized cargo can be modified or partially dismantled to fit a standard container.

Options may include:

• Removing protruding components
• Reducing overall height
• Packing accessories separately
• Redesigning crates
• Changing cargo orientation

Moving from special equipment to a standard 40HC may reduce:

• Ocean freight
• OOG surcharges
• Special terminal handling
• Lifting costs
• Inland transport complexity


How Do Surveys Support Cargo Insurance?

Project cargo is often high-value and difficult to replace.

Pre-shipment surveys can document:

• Cargo condition
• Packing condition
• Loading
• Lashing

If damage later occurs, this information can assist in establishing the condition of the shipment at different stages.

High-value projects may also use condition surveys at additional transport milestones.


What Is Chain of Responsibility in Australia?

Heavy road transport in Australia may also involve:

Chain of Responsibility — CoR.

In jurisdictions where the Heavy Vehicle National Law applies, parties that perform, control or influence heavy-vehicle transport activities may have relevant safety duties.

Depending on their actual activities, this may include:

• Consignors
• Packers
• Loaders
• Transport operators
• Freight forwarders or brokers
• Consignees

Project cargo therefore requires safe:

Packing + Loading + Load Restraint

after the international sea movement as well.


Why Does Road Lashing Matter?

The securing arrangement used for ocean freight may not automatically be suitable for Australian road transport.

Cargo may move from the port using:

• Flatbed trailers
• Low loaders
• Extendable trailers
• Heavy-haul equipment

A suitable road restraint plan may be particularly important for:

• High-centre-of-gravity machinery
• Oversized cargo
• Heavy equipment
• Irregular industrial cargo


Why Consider Marine Insurance?

Even with professional packing, surveys and securing, transport risks remain.

Examples include:

• Heavy weather
• Handling incidents
• Crane accidents
• Road incidents
• Collision
• Cargo shifting

High-value and difficult-to-replace project cargo may therefore warrant appropriate Marine Cargo Insurance.

Actual protection depends on the specific policy wording.


How Can Project Cargo Costs Be Optimised?

Early planning can sometimes identify lower-cost alternatives.

Examples include:

• Repacking into a standard container
• Using Flat Rack instead of Breakbulk
• Comparing RoRo options
• Removing detachable components
• Optimising origin ports
• Comparing carriers and schedules
• Planning inland heavy haulage early
• Reducing repeated lifts

Project freight should therefore be assessed on:

Door-to-Door Project Cost

rather than ocean freight alone.


Why Plan Customs and Biosecurity Early?

Project cargo entering Australia may involve:

• Customs clearance
• Tariff classification
• Biosecurity
• BMSB measures
• Timber packaging
• Used machinery cleanliness requirements

This can be particularly relevant to:

• Used machinery
• Breakbulk
• Flat Rack
• Open Top
• Timber-packed equipment

Identifying requirements before arrival can reduce expensive storage and specialist-handling delays.


Why Is Early Engagement Important?

Project cargo can involve:

• Manufacturers
• Packing companies
• Surveyors
• Freight forwarders
• Shipping lines
• Ports
• Customs brokers
• Biosecurity
• Insurers
• Crane operators
• Heavy-haul providers
• Final installation sites

If logistics planning begins only after the equipment has already been packed, many options may no longer be available.

Even a small change in crate height can turn a standard container shipment into an OOG Flat Rack movement.

Project planning should therefore ideally begin during the:

Packing Design Stage.


What Information Should Be Prepared?

Useful information includes:

• Cargo description
• Equipment use
• Dimensions of each piece
• Weight of each piece
• Total weight
• Cargo value
• Packing method
• Photos or drawings
• Centre of gravity
• Lifting points
• Whether the equipment can be dismantled
• Cargo-ready date
• Required delivery date
• Origin address
• Final destination
• Site access conditions

Technical or packing drawings can also assist with project planning.


Chinz Logistics Project Cargo Services

Chinz Logistics provides project cargo and oversized equipment solutions between China, Australia and other international markets, including:

• Flat Rack shipping
• Open Top containers
• Breakbulk cargo
• RoRo shipping
• FCL transport
• Heavy machinery shipping
• Heavy Lift cargo
• Cargo survey coordination
• Packing and lashing coordination
• China collection and warehousing
• Export customs support
• Australian import clearance
• Biosecurity-related logistics coordination
• Heavy haulage in Australia
• Crane and final-site delivery coordination

Project freight options can be compared according to cargo dimensions and weight, packing, origin and destination ports, vessel schedules, Australian inland transport requirements and project deadlines.

If you are preparing oversized machinery or Project Cargo, provide:

Cargo description + dimensions/weight of each piece + cargo value + photos/drawings + packing method + origin address + Australian destination + cargo-ready date

to help assess Flat Rack, RoRo, Breakbulk or other suitable transport options.

Chinz Logistics
Chinz Logistics
15+ years of local logistics experience in New Zealand, over 2 million parcels delivered

Get Quote Information

A. Business User
Personal Information
Shipping Information
Requirement Details
B. Individual User
To Australia
send to au/nz
To New Zealand
send to china

Scan the QR code to consult customer service for the latest activitiess and receive new uer benefits.